concrete batching plant zhengzhou China
concrete batching plant zhengzhou China
concrete batching plant zhengzhou China

concrete batching plant zhengzhou China

company : Henan Chunyue Import&Export Co.,Ltd
address : Zhongyuan District, Zhengzhou City, Henan province, China.

Contact

Which is the best concrete mixing station? Concrete mixing plant manufacturers, concrete batching plant zhengzhou China, our Henan Chunyue Import and Export Company is a professional, we are specialized in making various types of concrete mixing station, mixer, concrete mixer, our service is in place, the price package you are satisfied, go with the best price.

Our concrete mixing station in Zhengzhou, Henan Province, is environmentally friendly, low noise, energy-saving, power-saving, good performance and good mixing quality. Our spring is concrete batching plant zhengzhou China, many enterprises have cooperation with our company, whether small or large enterprises, customers have a high evaluation of our concrete mixing station.

concrete batching plant zhengzhou China

How often does the concrete mixing station maintain?

1. Inspection before each use of concrete mixing station

Check whether the self-protection device of air compressor in concrete mixing station is reliable and the air pressure is stable; check whether the water pump is sufficient and the pipeline is smooth; whether the opening and closing of hopper door, cement hopper door, intermediate aggregate hopper door and discharge door are flexible and reliable; check whether the connecting bolt of the main mixing machine blade is firm; check whether the electrical device is safe and reliable, and whether the limit switch is operated. Whether the switch is flexible and reliable; check whether there is enough lubricant in the accelerator at each lubrication point.

2. Maintenance after use of each shift

Clean up the accumulated material inside and outside the concrete mixer, and wash it out; fill the lubrication points, especially the seal of the axle end, and do not omit them; drain the liquid in the water purification channel in winter; drain the gas and water in the air compressor cylinder; all switches are in non-working state after shutdown, and cut off the power supply.

3. Weekly inspection and maintenance

Check the condensation of the residual concrete in the mixing tank, if there is condensation, stop the machine to eradicate (attention should be paid to the special care of the power supply), check the clearance between the mixing blade and liner, if not suitable for adjustment; check whether the air passage system is leaking, whether the cylinder is reliable; check the quality of lubricating oil in the reducer and the liquid level height, if necessary, add or replace; check the water supply system. Whether the suction bottom valve is reliable or not; check whether the electrical components are damaged, repair or replace if necessary, check whether the wiring is loose; open the silt, check the sealing condition of the shaft end, and screw in silt after no abnormality.

concrete batching plant zhengzhou China

phone number

+86 13607682968

e-mail address

Linda@chunyuetrading.com

location address

Zhongyuan District, Zhengzhou City, Henan province, China.

Contact

0.039337s